Tuesday, June 22, 2010

more..

Tile... Here is our kitchen and entry color







bathroom tiles..






Brick



Tuesday, June 8, 2010

go house go!!!!

Our house is going up fast. The electric, plumbing, and heating are all done. The instulation and dry wall went up today so YA!!! Heres the pictures...





The front door, the family room, and kitchen







upstairs, washer and dryer, bathroom







Master bathroom, hall,



The 4 car garage


Thursday, June 3, 2010

Cute pictures of Lillie and Stevie



more....









Bedroom..



Master Room


Pantry and 1/2 bath



Fireplace..

Tuesday, May 25, 2010

More walls... Second floor





We Have Walls







Back of the house



Here is the kitchen,


Glass doors off the dinner area


Kitchen/door to the garage



Front door/Family room




Basement


Monday, May 17, 2010

The New House!!

Our new house is finally started. The house plan we picked is a two story with a basement. The main floor will have just the great room, kitchen, and a small bathroom. Upstairs will have a huge master bedroom, bathroom, and walk in closet. (YA) Then two bedrooms, bathroom, and our washer and dryer. The basement will have just a great room, one bedroom, and a bathroom room, with a walk out stair case. I have been trying to take pictures of every step they have made. Here is some of the step they have done…

The marking of the lot..


The hole..



The footings..



The Foundation with forms



The Foundation..






Then.. They leveled out all the dirt and did some plumbing







More updates to Come!!!